Powered By Blogger

Thursday 16 February 2012

OCCULT PLANNING DOCUMENTATION

In our production meeting we planned the shots that we wanted to include. In terms of the light shots, we would go out and improvise depending on what we could see. With the actor's scenes, we planned 18 specific shots that would be shot over one day (plus cutaways). These shots would be filmed during the late afternoon so that we could catch a dusky natural light. In our location scouting we found a great demolished warehouse in Sylvester Gardens, Sheffield, where these scenes would be shot.


SHOT LIST FOR SYLVESTER GARDENS LOCATION





Shot No.
Description
Location
1
CU actor’s bare face , then putting make-up on
Warehouse Sylvester Street
2
MS actor putting make-up on
Warehouse Sylvester Street
3
ECU actor’s hand
Warehouse Sylvester Street
4
LA MS actor crouching behind fire
Warehouse Sylvester Street
5
HA LS actor crouching behind fire
Warehouse Sylvester Street
6
LS actor moving around room in warehouse (static for quick cutting)
Warehouse Sylvester Street
7
ELS actor moving around outside warehouse (static for quick cutting)
Warehouse Sylvester Street
8
CU actor leaning against a wall
Warehouse Sylvester Street
9
MS actor in frame of broken window
Warehouse Sylvester Street
10
LA CU actor’s face as he draws symbols on the floor
Warehouse Sylvester Street
11
HA CU OTS as actor draws symbols on the floor
Warehouse Sylvester Street
12
ECU of actor’s feet standing on the symbol
Warehouse Sylvester Street
13
ECU of actor as he draws symbols on wall
Street with brick wall
14
MS of actor as he draws symbols on wall
Street with brick wall
15
ECU fire
Warehouse Sylvester Street
16
POV PAN around warehouse
Warehouse Sylvester Street
17
LOCATION CUTAWAYS
Warehouse Sylvester Street
18
LOCATION CUTAWAYS
Street with brick wall




Before beginning to shoot our piece, we had to collaborate our own personal schedules and find time to shoot, record and edit our piece. In light of this particular discussion, and as producer of the film, I decided to draw up a schedule to stick to in order to complete the work on time. 


(Apologies for the difficult screen-shot. I had trouble getting the spreadsheet onto the blog)


I also drew up an equipment list so that we had everything we needed to start shooting.





EQUIPMENT LIST FOR 'OCCULT'

DATES PICK UP  30/01/12       3/2/12
DATES RETURN 02/01/12       9/2/12


QTY
DESCRIPTION
NOTES
1
Sony PD170 Camera
1 x Tripod
1
Marantz 660 Audio Recorder
1 x Cable
1 x Dynamic Mic
1 x Headphones
4 x Batteries (spare)
1
Rifle Microphone

1
Hydrophone
1 x Rubber contact





























No comments:

Post a Comment